top of page

Documents

Review draft content, workshop materials, and prior planning documents.

DRAFT: East Hampton Village Comprehensive Plan

The full draft of the Comprehensive Plan is available here for public review.

Public Workshop #3

The Village hosted the third of three public workshops on March 6, 2026, at the Emergency Services Building. The Workshop also served as the Public Hearing for the Comprehensive Plan Committee. Comments on the draft plan will be accepted through April 30, 2026. To download the presentation and view the recording, click on the buttons below.

Public Workshop 2

The Village hosted the second of three public workshops on May 1, 2025 on Zoom. To download the presentation and view the recording, click on the buttons below.

Public Workshop 1 Presentation & Summary

The Village hosted the first of three public workshops on December 6, 2024 at the East Hampton EMS Building. To view the presentation and a summary click the buttons below.

East Hampton Village Comprehensive Plan

The current Comprehensive Plan for the Village was adopted in 2002.

Open Space Program

The Open Space Program provides an updated inventory of open space programs and resources in the Village and sets priorities.

Design Guidelines for the Village's Commercial Districts

These design guidelines, adopted in 2004, supplement Chapter 121 Design and Site Plan Review of the Village Code.

Commercial Districts Study

The Village of East Hampton studied its six commercial districts in 2000 to analyze how well land development regulations would protect the village character.

Traffic Impact Study

Following the completion of the Commercial Districts Study, the Village studied existing conditions and future conditions at ten intersections throughout the Village.

Draft Comprehensive Plan Appendices

Public Engagement Summary and Transportation Memo

Subscribe for Updates

bottom of page